A hotel roof in Aspen cannot shed snow onto a walkway, a stair or a gas meter. The city's amended building code says so in plain words. That one rule changes the roof shape, the snow guards and the guest entry, and it is a good example of why hotel work in Colorado is about the weather before it is about the lobby.
We build steel framing, roofs and envelope for limited-service hotels, lodges and the metal buildings that go with them: pool houses, laundry buildings, maintenance shops, event barns and storage. Our job is to name the load package and the lead time up front, because State Highway 82 is the only major road to Aspen and snow closes it east of town over Independence Pass from about late October to Memorial Day. Then we price the shell in dollars per square foot and the guest-room finish separately, so an owner and a brand standard can each see their share.
We are straightforward about scope. We are a metal-building contractor, not an interior designer or a hotel operator. We build what holds up the roof and keeps the weather out, and we do it fast.
Snow, ice and the guest entry
Aspen's amended table lists a 100 psf ground snow load, a 36 inch frost line, Seismic Design Category C and a design elevation of 7,820 feet. Its roof amendment requires roofs to be designed so they do not shed ice and snow onto adjacent properties, walkways, stairs, exits, or gas and electric meters. For a hotel, that usually means a roof that holds snow in place with guards or sheds it into a protected zone, not above the front door.
Glenwood Springs sets a minimum ground snow load of 50 psf within city limits and never below 40 psf, scaling with finish floor elevation. Those are very different numbers from the Front Range, and the steel weight follows. A hotel at 7,800 feet carries a much heavier roof frame than one at 5,300 feet. We use the local table, not a generic one, and we show you the tonnage difference before you pick a site.
Frost depth, wildfire and mountain permits
Eagle County amends IBC section 1809.5 to require footings subject to frost to be at least 48 inches deep, and it takes snow loads from the 2016 Colorado Ground Snow Map or Colorado Design Snow Loads, using the more restrictive of that map and ASCE 7. Its wildfire regulations apply to all new construction in unincorporated areas and assign each project a hazard rating, with defensible space and ignition resistant construction in the higher zones. See Vail and Eagle County for the details we apply.
Summit County adopted the 2024 I-Code series with amendments for plans submitted on or after July 1, 2026, and all of Summit County is rated moderate to high fire intensity, requiring Class 2 structure hardening for permits applied for after May 4, 2026. For a hotel, that touches roof coverings, vents and exterior walls. A metal roof and fiber-cement or metal wall panels are a natural fit with those rules, and we cover the roof in our standing seam metal roofing service.
Where hotel pads are being planned
Not every hotel is in the mountains. In Firestone, a 75-room, three-story, 45,635 square foot limited-service hotel was proposed at 11256 Business Park Circle, northeast of the I-25 and Highway 119 interchange, on land that sold for $990,000 in August 2019. That kind of building is a repeat product: the same plan, a different site. In Castle Rock, Miller's Landing was planned at 65 acres to include a corporate campus, office, retail and a hotel at the I-25 and Plum Creek Parkway interchange.
Denver International Airport set a passenger record of 82,427,962 in 2025, and hotel demand near the airport follows that traffic. Our DEN area work is on the Peña Boulevard and E-470 side, where a hotel pad has direct access to the airport and the 47-mile toll beltway.
Working safely at altitude
Crews working above 8,000 feet need a plan for cold starts, short winter days and wind. We schedule steel erection around forecast, tie off every lift and stage materials so a storm does not scatter a panel bundle. Mountain highways close, and Vail Pass carries I-70 at 10,662 feet with grades up to 7%, so we plan deliveries on weather windows and keep a buffer of materials on site.
Fall protection, crane setup and lift plans are written for the site, not copied from another job. On a hotel that stays open next to the work, we separate construction traffic from guests with fencing, signage and a flagger when needed.
Buildings that go with the hotel
A hotel needs more than rooms. The pool and fitness building, the maintenance shop, laundry, housekeeping storage and the loading area are good steel buildings. Resort owners often want an event barn or a ski storage building, which are the same frame with a nicer finish. A seasonal operator with a recreation program may find ideas in recreation and sports facilities, which share the same wide-span structure.
If the property includes housing for staff, the plan may blend into multifamily and mixed-use construction. We keep the structures separate where we can, because separating them keeps fire ratings simple.
What moves a hotel shell price
Snow load, frost depth and delivery distance drive the mountain price. Face finish drives the rest. A limited-service hotel on the Front Range can use insulated panels and a simple roof; a resort lodge may need timber-look details, deep eaves and heavier glazing. We price the base building and the upgrades as separate items.
Compare against a plain commercial option. Office buildings use much of the same structure, with fewer rooms and a simpler envelope, and the comparison helps owners see what the hotel premium is paying for.
Price a hotel or lodge shell
Send us the site, the room count and the elevation. We will name the snow and frost package and give a shell price per square foot.
Related Building Types
Next Step
Plan This Project With Us
Tell us about the site, the building and the schedule, and we will set up a review of scope, schedule, permits and inspections.
Common Questions
Yes. Snow guards, roof shape and a protected entry canopy control where snow goes. Aspen requires roofs not to shed ice and snow onto walkways, stairs and exits. We design to the local rule and show where the snow will go.
Much heavier than the Front Range. A ground snow load of 100 psf in Aspen against 30 psf in Lakewood is more than three times the load, so the rafters, purlins and foundations all grow. We run the load table for your site and give you the tonnage difference.
In Summit County, all structures are rated moderate to high fire intensity and require Class 2 structure hardening for permits applied after May 4, 2026. Metal roofs and non-combustible wall cladding help meet that requirement.
We build the shell: frame, roof, envelope and slab, plus the support buildings. Interior rooms are finished by the hotel contractor or brand-approved trades. We coordinate with them.
The schedule depends on the site, the permit and the interior scope. The steel shell is fast. Interior finish, FF&E and brand inspections take longer. We provide a dated schedule once we see the plans.
PROJECT REVIEW
Tell us about the site, the building and the schedule, and we will set up a review of scope, schedule, permits and inspections.
SERVICE AREAS
See the Colorado communities where we plan and manage pre-engineered metal building construction.