Hangars and Metal Buildings Near Northern Colorado Regional Airport in Loveland

Hangars and Metal Buildings Near Northern Colorado Regional Airport in Loveland

Pre-engineered metal hangars and commercial steel buildings in Loveland: clear-span frames, large-opening doors, and flood-aware site planning for your lot.

Hangar owners near Northern Colorado Regional Airport tend to ask two things first: how wide can the door be, and how soon can it be standing. We erect pre-engineered metal hangars and aviation support buildings around Loveland, with clear-span frames, large-opening hangar doors and slabs designed for aircraft loads. The airport covers just over 1,000 acres about five miles northeast of town, with an 8,500 foot by 100 foot main runway and a crosswind runway, and it sees roughly 85,000 to 95,000 takeoffs and landings a year. That volume supports storage, maintenance and flight-support space.

We name the snow and wind package and the door load first, because the door is the biggest cost lever in a hangar. Everything else, the frame, the girts, the panels, is a known quantity.

Loveland builds beyond aviation. US 34 comes into town from Big Thompson Canyon as Eisenhower Boulevard, turns into a four-lane expressway and crosses both I-25 and US 287. Contractors, equipment dealers and service firms along that spine need shops, yards and storage, and a steel building is usually the quickest way to get one open.

The hangar package, door to floor

A hangar is a frame with a very large opening in one wall, and every decision follows from the opening. Bifold, hydraulic or sliding doors each put different loads on the header and the end columns. We design the frame around the door you choose, not the reverse, and our work on overhead hangar doors covers the operator, the seals and the clearance for tail height.

Inside, the slab matters as much as the steel. Floors need slope for drainage, tie-downs where you want them, and enough thickness for tugs and tow bars. We coordinate floor drains, fire protection and electrical rough-in before the slab is poured, because cutting a finished slab costs far more than planning it. If you are weighing a single-aircraft building against a multi-bay plan, our aircraft hangar team can price both.

Centerra and the I-25 interchange

Centerra is the commercial hub at the I-25 and US 34 interchange, shared by Loveland and Johnstown, with shopping centers, a mall, a medical center and the Blue Arena. A district like that generates steady work for the businesses behind it: service contractors, delivery fleets, facility maintenance firms and trades that serve the stores and clinics. Those firms need a shop with an office, a few overhead doors and a fenced yard. A commercial metal building with a front office and a rear shop often fits on a half acre.

We build that combination as a single steel package, and the usual question is how much of it goes under roof and how much stays in the yard. A neighboring option for some owners is Johnstown, which shares the same interchange, and others look north to Fort Collins for a technical customer base. We help you compare lots by access, utilities and what the local jurisdiction will allow, and then price the building.

Water, roads and the 2013 flood

Four days of heavy rain in September 2013 flooded Loveland along the Big Thompson River, closed roads, and collapsed sections of US 34 toward Estes Park. We do not treat that as history. It is a site condition. Before we price a building near the river or a drainage channel, we check the mapped floodplain, the finished floor elevation the city will require and how storm water leaves the site.

Raising the slab a foot or two is cheap compared with repairing a flooded one, and it is a line we price openly. It also changes the apron grade, the door thresholds and the delivery ramp, so we settle it with the engineer before the foundation drawings are final. Delivery routes matter too: US 34 into the canyon is the road people remember, so we plan truck routes before the first load is booked.

What moves the price per square foot

In a hangar, the door is the largest single line, then the slab, then the frame. A larger opening means a heavier header and heavier end columns, so the cost per square foot rises faster than the footprint does. Conditioned space, such as a pilot lounge, a shop bay with heat or a small office, adds insulation and mechanical work and shifts you toward insulated metal panels.

We give you the price in dollars per square foot for the shell and separate lines for doors, concrete, electrical and any site work. That makes it easy to see where a change saves money. A shorter eave, a smaller door or a simpler foundation can each move the total, and you decide which tradeoffs you want.

Beyond hangars: what else we erect in Loveland

For airport-adjacent owners, the most common request after a hangar is a maintenance shop, then a tool and parts room, then a covered storage building for ground equipment. Off the field, we build aircraft hangar style shells, self-storage lots and commercial buildings for trades.

Aviation is its own segment, with its own approvals and its own timing, and we serve aviation owners with the airport coordination that goes with it. Wherever the building goes, we arrive with the engineering package, the schedule and a single point of contact.

A few owners start with one bay and add more as business grows. We draw the first phase so the end wall can come off, and we leave the utilities where the next bay will want them. That is cheaper than tearing out a finished wall, and it keeps the first building useful from day one.

Price your Loveland steel building

Tell us the parcel, the aircraft or equipment and the door you need, and whether the building should be insulated. We will name the load package, the lead time and a dollars per square foot range for your Loveland building.

Next Step

Plan This Project With Us

Tell us about the site, the building and the schedule, and we will set up a review of scope, schedule, permits and inspections.

Request a Project Review

Common Questions

How wide can a hangar door be on a metal building?

Wide enough for most single-engine and light twin aircraft with a standard frame, and wider with a heavier header and special framing. Bifold and hydraulic doors have different opening limits. We size the door first, then design the frame around it, so the end columns and header carry the right load.

Do hangars near Northern Colorado Regional Airport need airport approval?

Often yes, because heights, setbacks and use can be governed by the airport owner as well as the city or county. We ask early, since a lease or height limit can change the building design. Bring us your lease terms and we will build the schedule around the approval steps.

Should I build in or near the Big Thompson floodplain?

Only after checking the mapped floodplain and what the permit office will require. The 2013 flood showed how fast water can close roads and damage sites. We raise the slab, shape the grade for drainage, and keep the delivery route away from low crossings.

What is the difference between a hangar and a shop building?

A hangar needs a very large door opening, a stronger header and a floor that handles tow loads. A shop usually needs several smaller doors, more partition walls and more utilities. We can combine them under one roof if the use calls for it.

How long does a small hangar take from order to finished building?

The steel package, engineering and permit are the long items, and the erection itself is quick by comparison. We give a lead time in writing before you sign. Simple single-bay hangars are among the faster jobs we do once the slab is cured.

PROJECT REVIEW

Tell us about the site, the building and the schedule, and we will set up a review of scope, schedule, permits and inspections.

SERVICE AREAS

See the Colorado communities where we plan and manage pre-engineered metal building construction.

Call us today720-782-2583